qiao@hvtest.cc15871365102
  • Автоматические водонепроницаемые изоляционные перчатки (сапоги) UHV-283

    Устройство для впрыска воды использует усовершенствованное ПЛК-управление, позволяющее осуществлять впрыск воды одним нажатием кнопки. Сборный контейнер питается от литиевой батареи, уровень заряда отображается в процентах от емкости батареи. Интерфейс взаимодействия человека и машины устройства для впрыска воды отображает подсказки о состоянии на протяжении всего процесса впрыска воды.

    Product Details of UHV-283 Fully Automatic Water Injection Insulating Boots (Gloves) Voltage Withstand Device

    DSC08011


    Параметры продукта:

    Intelligent insulation withstand voltage test for safety tools such as insulated shoes and gloves



    DSC08009


    Технические параметры:


    Device output voltage range

    AC 0~50kV (0~250V)

    Rated output capacity of the device

    5кВА

    Device input current

    0~20A

    Leakage current measurement range

    0~30.0mA (0~50mA can be customized)

    Погрешность измерения тока утечки

    1%±3 words

    Разрешение тока утечки

    0.01 mA

    Ошибка измерения напряжения

    ≤1% indication value ±0.1% range

    Current measurement error

    ≤1% indication value ±0.1% range

    Digital display timing

    0 ~ 999S

    Overall dimensions of console

    1300×940×860mm3

    Dimensions of the water injection unit

    1900×950×1860mm3

    Console weight

    50kg

    Injection weight

    200kg


    Water injection instructions:

    1. The test bench consists of two parts: an automatic water injection device and a testing machine device. The testing machine part is connected to the high-voltage connection and the shell part through insulation connection.  

    2. The water injection device includes a water pump, solenoid valve, and lifting motor. First, ground the test bench casing and connect it to an AC220V power supply. The test bench has an inlet and an outlet. The inlet is used to add water to the tank, and the outlet is used to drain the tank.  

    3. Connect the water pipe to the inlet, open the water valve to fill the water tank with water, and then close the water valve. Attention: Do not leave when filling the sink to prevent water from overflowing.  

    4. The device uses recycled water. When the power supply of the test bench is turned on, the power indicator light will light up and the system will be in standby mode. There are two buttons on the control panel in front of the test bench, namely the glove test button and the emergency stop button. When a test sample is installed on the water tank test stand, press the glove to test. The water injection device will descend and insert the water injection port into the test sample. Then, inject water into the test sample (only those with the test sample installed will be injected) until all injected water reaches the required water level for the test. The water injection device will automatically lift and return to its initial position, completing the water injection process.  

    5. Adopting touch screen display and parameter settings.


    Charging instructions:

    The testing machine needs to be charged before high-voltage testing. Insert the charger into the charging port of the testing machine, connect 220V power to charge the battery, and the "charging" and "battery voltage" indicators will light up. As the battery level continues to increase, the "battery voltage" indicator light will be lit one after another. When the battery is fully charged, the "fully charged" indicator light will turn on. Generally, charging takes 2-8 hours. If the battery is not used for a long time, it should be charged and discharged once every 1-2 months.









    Вам также может понравиться

    • Посетите нас

      Корпус 6, Оптико-механический промышленный парк «Долина оптики», 84 Gaoxin 5 Road,
      Зона развития новых технологий Восточного озера, город Ухань, провинция Хубэй, Китай

    • Свяжитесь с нами по электронной почте

      qiao@hvtest.cc

    • Позвоните нам

      +86-15871365102